Introduction: Lowe Property Care Ltd was required by a M&E company to deliver a temporary toilet cubicle installation. The requirement was to quickly and efficiently install a clean, functional and secure temporary toilet solution for on-site personnel during on-going construction work.
Background: The construction project formed part of a project in a prominent commercial location, therefore the works needed to be carried out to a high standard with minimal disruption.
Objectives:
- Delivery and installation of secure temporary toilet cubicles.
- Coordination with site management for optimal location placement and access.
- Connection of plumbing and waste services in line with health and safety regulations.
- Testing and ensuring the toilets had full functionality.
- To have a final handover with client sign-off and usage guidance.
Outcomes:
- Fast and efficient installation: the temporary toilet was delivered and installed within the required timeframe, avoiding delays to site operations.
- Full functional and compliant facility: all works were completed to industry standards, ensuring comfort and hygiene for site staff.
- Client satisfaction: the client was pleased with the speed and professionalism of the installation.
Conclusion:
This project demonstrates Lowe Property Care’s capability to deliver responsive, site-specific solutions in a high-paced construction environment. By providing a clean, compliant and fully operational toilet cubicles quickly and efficiently.