Temporary Toilet Cubicle Installation for a M&E Company

Introduction: Lowe Property Care Ltd was required by a M&E company to deliver a temporary toilet cubicle installation. The requirement was to quickly and efficiently install a clean, functional and secure temporary toilet solution for on-site personnel during on-going construction work.

Background: The construction project formed part of a project in a prominent commercial location, therefore the works needed to be carried out to a high standard with minimal disruption.

Objectives:

  1. Delivery and installation of secure temporary toilet cubicles.
  2. Coordination with site management for optimal location placement and access.
  3. Connection of plumbing and waste services in line with health and safety regulations.
  4. Testing and ensuring the toilets had full functionality.
  5. To have a final handover with client sign-off and usage guidance.

Outcomes:

  1. Fast and efficient installation: the temporary toilet was delivered and installed within the required timeframe, avoiding delays to site operations.
  2. Full functional and compliant facility: all works were completed to industry standards, ensuring comfort and hygiene for site staff.
  3. Client satisfaction: the client was pleased with the speed and professionalism of the installation.

Conclusion:

This project demonstrates Lowe Property Care’s capability to deliver responsive, site-specific solutions in a high-paced construction environment. By providing a clean, compliant and fully operational toilet cubicles quickly and efficiently.